With the exception of some wiring and the connecting hoses from the supply tanks to the oil pumps, the oil supply work is complete. The starting position gauges also need their pressure lines attached and the electrical lines to the instrument panel gauges and warning lights can now be attached. |
Gallery Index | Previous Page | Next Page
080_001
080_002
080_003
080_004
080_005
080_006
080_007
080_008
080_009
080_010
080_011
080_012